FAQ

Have Any Questions?

Magna viverra mus vivamus eleifend ligula sociis taciti nibh malesuada, nunc proin odio hendrerit

We are a manufacturer in beverage machine field more than 15 years, located at Leyu town,zhangjiagang,2 hours from Shanghai,1 hour from Wuxi by car. We will pick you up to visit our factory.

SGS,ISO,CE, and we also have own trademark “SHEENSTAR”

2000-36000 bottles in 500ml per hour.

12 months warranty.a solve basic questions by telephone, email, and video call. Engineer will go to buyer’s factory to install, test machines, and train buyer’s staff how to operate, maintain machine. Operating manuals will be sent with machine also by email. We also have overseas service center.

Yes.

  1. What kind beverage you want to produce?
  2. bottle volume? 250ml, 330ml, 500ml, 750ml, 2L,5L 10l, 15L 5 gllon or other size?
  3. Producing capacity requirement? How many bottles per hour?
  4. Raw water analysis report
  5. Voltage and altitude.

Blowing filling capping combi, 200ml-2liter drink water/juice/carbonated drink filling line, 5 gallon/20L water line, water treatment system, bottle blowing making machine, after packing system(label machine, PE film shrink packing machine, carton machine).

When you finish the Preparation conditions(water resource,electricity,air supply,production materials)contact with our sales people we will dispatch engineer to install the machine for you ,and train your employees to use the machine well. Normally when your preparation is done,you can contact with our sales people and cooperate us to get the visa for the engineer and our engineer will be there within 15 days.

Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.

According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.

We accept 30% deposit 70%TT before shipment by TT/LC/Western union.

We provide EXW,FOB,CFR,CIF delivery terms.